In 2021, the reconstruction of aspiration units AU-13 and AU-14 was carried out in workshop No. 62. As a result of the reconstruction, dust emissions into the atmosphere were reduced to 22-24 mg/m³, and the collected dust can be reused. The total cost for the reconstruction of the relevant aspiration units amounted to more than UAH 2.5 million.
In 2022, AU-16 was modernized in workshop No. 62. The estimated cost of improving the unit was about UAH 1 million. The plant is planning to develop a project for the creation of a system for continuous monitoring of emissions from furnaces No. 1 and No. 2 in workshop No. 2.